The current projects include all urgent rehabilitation works with emphasis on the works required to improve the reliability of the plant operation, both in term of quantity and quality. Below is a list of projects with images. 

The works already completed or under implementation include:

Overhaul Intake Pump No. 4 
View Image 

Overhaul Intake Pump No. 3
 
View Image 

Install new sludge scrapper in Sedimentation Tank No. 6 
View Image 

Install AMF panel (for generator’s operation) 
View Image 

Install new generator – 1500 KVA 
View Image 

Install new panel (for utility equipments’ operation) 
View Image 

Install new flow meter on distribution pipe ND 900 
View Image 

Install new motorized valve on distribution pump No. 2 and 4’s outlet pipes 
View Image 

Install 315 KW inverter on distribution pumps 
View Image 

Install 200 KW inverter on distribution pumps 
View Image 

New Online Computerized Monitoring System 
View Image 

Installation of new Package WTP’s submersible pump 
View Image 

Lining and coating with epoxy – 12 Filter Tanks 
View Image 

Installation of new main power panel 
View Image 

Overhaul blower 
View Image 

Installation of new Tube Settlers in 6 Sedimentation Tanks (on going) 
View Image 

Replacement of the Raw Water Pumps 
View Image 

Addition of temporary screens at the intake 
View Image 

New automatic dosage of coagulant according to the raw water turbidity 
View Image 

Improvement of the Flocculation tanks isolating gates 
View Image 

New Flocculators control panel 
View Image 

Repair of the sedimentation tanks clarified water troughs 
View Image 

Repair of the sedimentation tanks scraper cable system and new control panel 
View Image 

Rehabilitation of 3 filters and backwash pumps 
View Image 

Addition of a new Chlorinator and overhaul of the existing one 
View Image 

Rehabilitation of the chlorine leakage neutralization system 
View Image 

Clear water tanks manual valves replaced by motorized one 
View Image 

Installation of a new magnetic flowmeter (Distribution) 
View Image 

Rehabilitation of the main electrical panels 
View Image 

New Data Control system and on-line recorders (PH, Turbidity, Residual Chlorine) 
View Image 

New Laboratory instruments 
View Image